Fee Schedule

Planning and Zoning/Central Permitting Fee ScheduleClick Here

Building Inspections Fee Schedule

Minimum Permit fee – $75.00 (All permits will have a 5.00% Tech fee and a 2.00% State surcharge-each assessed on the subtotal amount separately)

Re-Inspection fee     $125.00

Permit Extension fee – $100.00 (for 1st renewal and $75 per six-month period after that)

Work without a permit violation fee – $125.00

New construction

All usable area under roof:    (Includes all areas of new construction, finished or unfinished)

Up to 40,000 square feet – $0.16 per square foot

40, 000 square feet and above – $0.12 per square foot

Usable areas not under roof: (Includes decks, patios, ramps and loading docks) $75.00 or $0.16 per square foot or whichever is greater

Piers   $75.00

Pools

  • In-ground – $125.00
  • Above Ground – $75.00

Retaining Walls (as defined by Building Code) – $75.00

Towers – $75.00

Alterations – $0.12 per square foot (Alterations to shell buildings, unfinished tenant spaces, garages and attics to create finished space and alterations to previously finished spaces.)

Mobile Homes

  •  Blocking –  $75.00
  •  Plumbing – $75.00
  • Electrical – $75.00 (on private property electrical fee schedule applies)
  • Mechanical – $75.00

Demolition

  • Main buildings and structures             $75.00
  • Accessory buildings and structures    $75.00

Move Permits

  • Main buildings or structures               $75.00
  • Accessory building or structures         $75.00

Signs – $75.00 per sign

Tents and other temporary structures $75.00 (900+ sq. feet)

Chimneys, fireplaces, etc. – $75.00 (Permit for chimneys, fireplaces, wood and coal stoves and other solid fuel burning heaters not included in new construction permit)

Plans examination

  • Commercial – $250.00 (plan review fee for structures other than residential or accessory structures)
  • Residential – $150.00 (plan review fee for residential structures)

Appeals – $150.00

Plumbing

Basic permit fee:

  • Residential – $75.00 for the first bathroom (includes 1/2 baths)
    • $10 for each additional (including ½ baths (minimum $75))
  • Commercial –  $75.00 + $10.00 per fixture

Sewers, manholes, storm drains, area drains or devices: $25.00 each (minimum $75 permit fee applies)

Electrical

  •  New service equipment:
    •  0-200 amps      $75.00
    • 201-400 amps      $75.00
    • 401-600 amps      $100.00
    • 601+ amps      $100.00+$20 per 50 amps above 600
  •   Service upgrades and relocation of service equipment – $75.00
  •   Temporary Service Poles – $75.00 (at the beginning of construction)
  •   Service connection prior to final inspection –  $75.00 (30 Day Temporary Power)
  •   Reconnection fee – $75.00
  •   Connections and outlets – $75.00

Mechanical and Gas

  • Basic permit fee for New Construction and Equipment replacement/repair –
    • Up to $1000 contract value – $75.00
    • Over $1000 contract value  –  $75.00 + $8.00 per $1000 or fraction thereof.
  • Fuel piping:
    • Minimum permit fee – $75.00
    • Each outlet – $10.00 (minimum $75.00)
  • Fuel storage tanks and piping –  $75.00 per tank
  • Removal of fuel storage tanks – $75.00 per tank
  • Fire suppressions systems – See basic mechanical permit fee
  • Elevators, dumbwaiters, etc. – $75.00 per unit

Temporary Certificates of Occupancy

  • Residential – $150.00/30 day period
  • Commercial –   $300.00/30 day period
About IOW County
AFDAC
Assessments
Athletics and Sports
BUDGET DOCUMENTS
Board of Supervisors
BZA
Citizen Self Service
Commission on Aging
County Fair
County TV
Elections
HARC
Hurricane
FOIA Requests
IOW Home Page
IOW Home Page
IWAlert
Map Gallery
Newcomers Guide
Nike Park SK8
Pay Animal Services
Pay Emergency Services
Pay for Permit/Inspection
Pay Taxes
Pay Water Bill
Pet License
Planning Commission
Property Map
Public Records
Purchasing
Recreation
Surplus Items
Transportation
Wetlands Board

Novus BoardWeb
Employee Portal

A community of CHOICE committed to excellence.